Thursday, December 1, 2011

Sodding







POA is sodding boat ramp area. Thanks for your help JT.





Tuesday, November 22, 2011

PORCELAIN FLOORING


The Rec Hall flooring has been completed. The carpet was removed
and Porcelain Tile that looks like wood was installed.











Tuesday, November 15, 2011

Rec Hall Improvement



Carpet will be replaced with Porcelain non-skid tile. Work should be completed by Thursday, November 17, 2011



New First Aid Kit at Pool

This is the first aid kit we had in the swimming poool area.

This is the new first aid kit in the swimming pool area.

Replaced 11/12/11



Friday, November 4, 2011

Pool Lights

The spot lights inside pool have been replaced.

Old Satellite



If anyone needs a satellite I have one for sale. CHEAP!!!

JK The satellite was an eyesore so I had POA maintenance staff remove it.





Wednesday, October 19, 2011

Striping the Parking Lot

Parking lot was striped including handincap signs

Replanting Kalanchoe's



Ramiro and Jose replanting kalanchoe's in the clubhouse area.



Painting Speedbumps



PAINTING NEW SPEED BUMPS AND ALL THE REST.


Thursday, October 6, 2011

10/6/11 POURING ASPHALT




CONSTRUCTION COMPANY STARTED POURING ASPHALT.




Wednesday, October 5, 2011

10/5/11 - Road Repairs




2nd day of Road Maintenance.


Tuesday, October 4, 2011

2ND SET (STREET REPAIRS)


THIS IS IN FRONT OF 120 MISSISSIPPI.


STREET REPAIRS









ROAD REPAIRS BEGAN TODAY.

THEY WILL BE DOING FROM THE

ENTRANCE TO 120 MISSISSIPPI.






Monday, October 3, 2011

GRILL TIRES



Bought a set of used tires for the grill. (Here are the before and after pictures.)



LAWN MOWER TIRES

The lawn mower tires were both replaced.

STREET CLEANING



Elsie and Sylvia cleaning streets after the concrete debris was moved.



PAINTING

Jose and Ramiro painting fire hydrants and resaca water faucets.



Wednesday, September 14, 2011

Cleaned Up

All the concrete debris was removed from the area along highway 281.

Wednesday, August 24, 2011

Exhaust Fans







The 2 exhaust fans in the Men's Facilities downstairs have been replaced. This was a complicated project. Thanks to Bobby Wood for his help on this one.






Front Entrance Walls





Big difference! Before and After the entrance walls have been pressure washed.






Wednesday, July 6, 2011

Gameroom Door Screens Fixed

All Screens doors in the Gameroom have been fixed


Men & Woman Shower Stalls Painting

Downstairs facilities have been scraped and in the process of being painted.

Thursday, June 30, 2011

PAINTING GAMEROOM



Jose and Ramiro started painting the gameroom.



RAIN

Finally, a rainy day in the Valley thanks to TS Arlene.

Friday, June 10, 2011

Rec Hall Lobby TV




Jack and Lea Coleman donated this 60" TV for the Rec Hall Lobby.


Thank you Jack and Lea Coleman




Thursday, June 9, 2011

NEW PROJECT: REC HALL

The foam ceiling tiles in the Rec Hall are being fixed by our Maintenance
Boys. (Jose and Ramiro)